Dorman Drive - Water Line Replacement/Services
- jgronlund
- 9 hours ago
- 1 min read
JR Contracting will be installing new waterlines and services on Dorman Drive. The entire length from Rock Run throughout the loop will be impacted.
Proposed starting date is October 27th and expected conclusion is November 28th.
Temporary asphalt installed in ditch during construction. Please exercise caution when traveling on Dorman Drive.
Thanks!